Solar installation
across Cyprus
From the south-east coast to the mountains and the capital — we install, monitor, and maintain solar systems in every Cyprus district. Pick yours below.
Five service areas.
Same German-grade installation everywhere.
Cyprus is small enough that we cover the whole island with our own team — no subcontractors, no regional middlemen. Every install is led by a German-trained engineer who handles your EAC application end-to-end.
- ✓Free site visit within 48 hours
- ✓EAC + Net Billing paperwork handled
- ✓1–2 day installation window
- ✓Lifetime remote monitoring
300+
Sunny days a year
Cyprus has the highest sun-hour average in the EU
1,750 kWh/kWp
Typical annual yield
Among the strongest solar resources in Europe
3 yrs
Average payback
After payback, every kWh is pure profit for the next 25+ years
Net Billing
Current scheme
Surplus solar earns grid credit — the scheme that replaced net metering in 2026
Pick your district
Local expertise in every corner of Cyprus
Every district has its own quirks — building stock, microclimate, EAC sub-station capacity. Tap your location for a local breakdown.

Solar Panels in Larnaca
As a leading provider of PV solutions in Larnaca, we combine technical expertise with local knowledge to design and install solar technologies that maximise your property's energy potential.
- Yield
- 1,700kWh/kWp
- Avg system
- 5 kW
- Payback
- 3.2years

Solar Panels in Limassol
Limassol's coastal climate and high property values make it a prime location for solar investment.
- Yield
- 1,720kWh/kWp
- Avg system
- 5.5 kW
- Payback
- 3.0years

Solar Panels in Paphos
As the leading provider of PV installations in Paphos, we combine technical expertise with deep local knowledge, designing and installing solar systems that maximise output across coastal villas, urban homes, and commercial properties in Kato Paphos, Peyia, and beyond.
- Yield
- 1,720kWh/kWp
- Avg system
- 5 kW
- Payback
- 3.1years

Solar Panels in Nicosia
Nicosia, Cyprus' inland capital, delivers among the strongest solar yields on the island thanks to consistently clear skies and a dry climate.
- Yield
- 1,760kWh/kWp
- Avg system
- 6 kW
- Payback
- 2.9years

Solar Panels in Ayia Napa
Ayia Napa and the wider Famagusta coast combine intense sunlight with high seasonal demand from hospitality, restaurants, and holiday lets, making solar one of the highest-impact upgrades any property owner can make.
- Yield
- 1,730kWh/kWp
- Avg system
- 6 kW
- Payback
- 3.0years
Side-by-side
Compare solar economics by district
Why does Cyprus rank in the top three solar markets in Europe? Look at the numbers.
| District | Sun hrs | Yield (kWh/kWp) | Avg system | Annual savings | Payback |
|---|---|---|---|---|---|
| Larnaca | 1,800 | 1,700 | 5 kW | €2,100 | 3.2 yrs |
| Limassol | 1,820 | 1,720 | 5.5 kW | €2,580 | 3.0 yrs |
| Paphos | 1,840 | 1,720 | 5 kW | €2,260 | 3.1 yrs |
| Nicosia | 1,850 | 1,760 | 6 kW | €2,820 | 2.9 yrs |
| Ayia Napa | 1,810 | 1,730 | 6 kW | €2,770 | 3.0 yrs |
Figures are typical averages from systems installed by Smart Solar Cyprus, modelled at €0.30/kWh and current EAC tariffs. Your actual numbers depend on roof orientation, shading, and consumption profile — book a free site visit for an exact quote.
Wherever you are
Same process, same standards — district to district
Cyprus is small, our team is one. Whether you live in central Nicosia or a Paphos hill village, you get the same engineers, the same components, and the same paperwork support.
Site visit
We measure the roof, model shading, and check your EAC sub-station capacity.
Proposal
Custom system sizing with exact panel count, inverter, mounting, and turnkey price.
Install + paperwork
1–2 day install, plus full EAC application and Net Billing submission on your behalf.
Monitoring + service
Lifetime remote monitoring — if a panel ever underperforms, we know before you do.

Same team, every install
No subcontractors. No regional middlemen. Just engineers.
Not sure which district covers you?
Drop us your address — we serve every postcode in Cyprus, often within a 48-hour site-visit window.
